Pemilihan Vendor Dalam Proyek Mud Removal Pada Tambang Batu Bara (Studi Kasus PT. Darma Henwa)
Abstract
Keywords
References
Amid, A., Ghodsypour, S. H., & O’Brien, C. (2009). A weighted additive fuzzy multiobjective model for the supplier selection problem under price breaks in a supply Chain. International Journal of Production Economics, 121(2), 323–332. https://doi.org/10.1016/j.ijpe.2007.02.040
Cahyadi, T. A., Magdalena, S., Haryanto, D., Ratminah, W. D., Rosadi, P. E., & Asmara, P. E. (2020). Planning of mining water management costs. AIP Conference Proceedings, 2245. https://doi.org/10.1063/5.0007076
Chai, Y., & Schoon, M. (2016). Institutions and government efficiency: Decentralized irrigation management in China. International Journal of the Commons, 10(1), 21–44. https://doi.org/10.18352/ijc.555
Durdyev, S., Omarov, M., & Ismail, S. (2017). Causes of delay in residential construction projects in Cambodia. Cogent Engineering, 4(1), 1–12. https://doi.org/10.1080/23311916.2017.1291117
Fugger, N., Katok, E., & Wambach, A. (2019). Trust in procurement interactions. Management Science, 65(11), 5110–5127. https://doi.org/10.1287/mnsc.2018.3196
Gergin, R. E., Peker, I., & Kısa, A. C. G. (2022). SUPPLIER SELECTION BY INTEGRATED IFDEMATEL-IFTOPSIS METHOD: A CASE STUDY OF AUTOMOTIVE SUPPLY INDUSTRY. Decision Making: Applications in Management and Engineering, 5(1). https://doi.org/10.31181/dmame211221075g
Hosseini, S., & Khaled, A. Al. (2019). A hybrid ensemble and AHP approach for resilient supplier selection. Journal of Intelligent Manufacturing, 30(1), 207–228. https://doi.org/10.1007/s10845-016-1241-y
Khoshfetrat, S., Rahiminezhad Galankashi, M., & Almasi, M. (2020). Sustainable supplier selection and order allocation: a fuzzy approach. Engineering Optimization, 52(9). https://doi.org/10.1080/0305215X.2019.1663185
KWATSIMA, S. (2015). an Investigation Into the Causes of Delay in Large Civil Engineering Projects in Kenya. 72. Retrieved from http://ir.jkuat.ac.ke/bitstream/handle/123456789/1604/Kwatsima%2C Symon Antony- MSc. Construction Engineering and mangement -2015 construct1.pdf?sequence=1&isAllowed=y
Mirsa Diah Novianti,, Anitawati, Aurino Djamaris, A. A. (2016). Analisis Kriteria Pemilihan Supplier Menggunakan Metode Analytic Network Process (Studi Kasus pada PTXYZ). In Universitas Bakrie. Retrieved from https://repository.bakrie.ac.id/335/1/Laporan penelitian genap 1516_MDN-ARD-ANT.pdf
Pujawan, I. N. (2011). The Effect of Different Payment Terms on Order Variability in a Supply Chain. In Successful Strategies in Supply Chain Management. https://doi.org/10.4018/978-1-59140-303-6.ch005
Saaty, T. L. (2013). The modern science of multicriteria decision making and its practical applications: The AHP/ANP approach. Operations Research, 61(5). https://doi.org/10.1287/opre.2013.1197
Safa, M., Shahi, A., Haas, C. T., & Hipel, K. W. (2014). Supplier selection process in an integrated construction materials management model. Automation in Construction, 48, 64–73. https://doi.org/10.1016/j.autcon.2014.08.008
San Cristóbal, J. R. (2012). Contractor Selection Using Multicriteria Decision-Making Methods. Journal of Construction Engineering and Management, 138(6), 751–758. https://doi.org/10.1061/(asce)co.1943-7862.0000488
Streule, T., Miserini, N., Bartlomé, O., Klippel, M., & De Soto, B. G. (2016). Implementation of Scrum in the Construction Industry. Procedia Engineering. https://doi.org/10.1016/j.proeng.2016.11.619
Yadav, V., & Sharma, M. K. (2015). Multi-criteria decision making for supplier selection using fuzzy AHP approach. Benchmarking: An International Journal, 22(6), 1158–1174. https://doi.org/10.1108/BIJ-04-2014-0036
Refbacks
- There are currently no refbacks.
Indexed by :
Editorial Office :
Journal of Entrepreneurship, Management and Industry (JEMI)
Jl. HR Rasuna Said Kav. C-22, Rasuna Epicentrum, Kuningan. Jakarta Selatan 12920. email : [email protected]
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.